The west bay had undergone a major transformation closing the upper gallery and converting its tiled roof on terrace, remains the eaves and bow high living are observed. At the front of the lower hall was had added a tiled plinth and plasterwork completed.

It has opened the upper gallery regaining its original appearance, with Arab-tile roof and eaves. Removed the socket and plasterwork added to the main entrance. Has reconstructed the pool which appeared in archaeological excavations and retaining some of its original pavement

patio_oeste_antes_de_su_restauracion_hotel_casa_morisca  patio_oeste_restaurado_hotel_casa_morisca